Peak Day Flow Model

One shift through pick, takeaway conveyor, put wall and pack. Change any input and watch where the building backs up. Sample data.

Shift clock06:00
Speed
Working Idle / starved Blocked Tote moving Tote stopped in accumulation / order waiting for pack Tote at induct / order ticket waiting for release Red outline = current constraint
Shipped
0
of 0 received
Waiting for release
0 orders
no wall cell free yet
Totes on conveyor
0
of 60 accumulation
Wall cells in use
0
of 180
Waiting for pack
0 orders
0 min of pack work
Order cycle time
–
release to packed, minutes
Inputs
Demand
Pick
Conveyor
Put wall

Wall cells take effect when you reset the shift.

Pack

Demand vs. shipped

Orders per hour. When the red area opens up, orders are arriving faster than the building ships them, and the backlog grows.

Orders arrivingOrders shippedFalling behind

Shift log

What happened, and when.

  • Events appear here as the shift runs.

Waiting for release

0

Orders received but not started. Grows when the wall has no free cells.

Put wall

0 / 180

Cells in use (blue), and how many hold finished orders waiting for pack (amber). Dashed line is capacity.

Conveyor

0 / 60

Totes on the takeaway and waiting to induct. At the dashed line, pickers can't drop totes.

Capacity check

Pick
0% · avg 0%
Put
0% · avg 0%
Pack
0% · avg 0%

Bars show utilization over the last 10 minutes; "avg" is the shift so far.